Safety and site integration

Prepared to work safely inside your site controls

Pangea plans the people, RAMS, inductions and work interfaces before mobilisation, then works through the client's permit, isolation and handover systems on site.

PACKAGE CONTROLS
01Site-specific RAMS
02Permit integration
03Isolation checks
04Clear responsibility split
Site-specific RAMSPermit integrationIsolation checksClear responsibility split
01

Safety preparation before the shutdown

Deal with the predictable requirements before the first shift

Pangea liaises with the site planner, shutdown coordinator or responsible engineer to understand the job and the controls that apply. The aim is to arrive with the crew accepted, the work understood and the foreseeable access or equipment needs already raised.

  • Prepare and submit site-specific RAMS
  • Provide required compliance and competency information
  • Identify and arrange outstanding site inductions
  • Confirm access, scaffolding and lifting requirements
  • Plan specialist tools, equipment and parts
  • Clarify the responsibility split and route for technical decisions
  • Dynamically perform risk assessments if environment or method changes
  • Build our own method statements for each piece of work or use yours
02

Suitably qualified cover for the work

Competence is planned at crew level

We use our skills matrix to check the qualifications, certifications and practical capabilities available in the proposed crew. The planned team must include suitably qualified people for the activities in scope, including specialist tasks such as confined-space work or lifting operations where those activities are required.

We also aim for a useful spread of skills across the crew. Any extra work is still checked against competence, equipment, time, RAMS and permit requirements before it is accepted.

03

Working through the client's permit system

The site controls the system. Pangea checks and works within it

On most operating sites, the client controls permits, isolations and the release of equipment. Pangea does not replace that system. Our role is to understand the handover, check the information against the physical equipment and follow the site's arrangements before our people start work.

  • Check the equipment identity and stated isolation boundary
  • Cross-reference valve, lock and isolation information
  • Check relevant drains, valves and electrical isolation points
  • Consider stored mechanical, electrical or process energy
  • Apply personal or contractor locks where required by the site system
  • Stop and raise the issue if the physical condition does not match the handover
Elevated access platforms with safety railings inside an industrial workshop.
04

Check the handover, not just the paperwork

Your team may be releasing dozens of jobs. Our team is accepting this one

A signed permit or isolation record is an essential control, but the people accepting the job still need to make sure it makes sense at the equipment. Pangea checks that the kit appears safely presented for the work we have been asked to carry out and raises anything that is unclear before proceeding.

This is part of being self-managed. It gives the client's responsible team another practical check at the point where the work changes hands.

05

One lead for site coordination

Keep safety, progress and technical decisions on a clear line

The Pangea lead engineer is the principal interface with the client. They coordinate the crew, maintain awareness of the agreed scope and provide a clear route for progress updates, unexpected findings, additional-work requests and handback.

This helps the site integrate Pangea into a wider shutdown without having to manage every individual on the crew.

06

Mechanical completion and return to service

Make the condition of the equipment clear before control passes back

At completion, Pangea confirms the mechanical work carried out, any outstanding concerns and the status of the agreed checks. Testing, commissioning and re-energisation interfaces are agreed with the responsible site team, including who controls each stage.

Where it forms part of the package, Pangea can support testing and remain available while equipment returns to operation. The handback record is matched to the work and can include parts used, measurements, findings and actions that remain open.

07

Clear responsibilities make safer work

Before the job begins, we establish what Pangea owns, what remains under client control and where other specialists need to be involved. If the scope changes, that responsibility split is reviewed rather than assumed.

The objective is straightforward: get everyone in and out safely, complete the agreed work properly and leave the site with a clear account of what has been handed back.

Start with the scope

Discuss your site requirements.

Tell us about the planned work, the controls that apply and what information your site needs before mobilisation.